Growing firm HDG Architecture recently designed and moved into their new offices, located in Spokane, Washington.
The entire building had a new rigid insulation roof installed for energy efficiency and to allow us to expose the original structure. All new RTU for heating and cooling, an entire new storefront system, including over 2100 sf of glass, a black, polished plaster finish over the failing brick. We added alcoves for each entry, flanked by an oiled, VG fir, wood cladding.